top of page

Toyo Engineering Project

Biggest Units

HL & ODC Units

Kardelen Barge

Project:

TGPC PROJECT

Plant:

Gas Separation, Ethane Cracker and Polypropylene Units plant

Client:

Toyo Engineering Corporation

Consignee:

State Concern “TURKMENGAS”

​Duration:

April 2015 – November 2016

Total tonnage:

18 392 tons

Total volume:

85 025 FRT

Services provided:

  • Ro Ro jetty construction at Kianly;

  • Vessels offloading and terminal handling in port Turkmenbashy for GC, ODC and HL units;

  • Delivery of cargoes from port Turkmenbashy and Kianly jetty upto TGPC site;

  • ODC permissions obtaining;

  • Rout preparations and convoys arrangement;

  • Construction of by-passes;

  • Sea barge chartering and agency service;

  • Barge ballasting and assistance in roll off operations at RO-RO jetty;

  • Customs brokerage;

Scope:

For implementation of this project, AY constructed Ro-Ro jetty in Kiyanly. Freight Barge and tug boat for pulling HL/ODC items from Turkmenbashy port directly to Kiyanly. AY executed overall offloading & loading operations in Turkmenbashy port.

Max. piece was transported on barge 163MT, 145MT and 205MT average.

Total quantity to be transported is 50 HL/ODC pieces.

In August’2016 AY executed the offloading at Turkmenbashy Sea Port and further roll on / roll off operations by SMPT 40 axles trailers from Ro-Ro jetty Kiyanly of Polypropylene and Ethylene fractionators which arrived from Constanta port, and weighing 534MT and 343MT respectively.

bottom of page